Social acceptance of nuclear power has become a decisive factor in framing a sustainable energy policy. This study examines social acceptance for cancelling the construction of planned nuclear power plants (NPPs) and replacing them with other energy sources. The contingent valuation method (CVM) and...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Sustainability 2018-10, Vol.10 (11), p.3833
Hauptverfasser: Woo, JongRoul, Lim, Sesil, Lee, Yong-Gil, Huh, Sung-Yoon
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Social acceptance of nuclear power has become a decisive factor in framing a sustainable energy policy. This study examines social acceptance for cancelling the construction of planned nuclear power plants (NPPs) and replacing them with other energy sources. The contingent valuation method (CVM) and cost–benefit analysis (CBA) are used to access the social acceptance and financial feasibility of such projects. Empirical analysis is based on the case of South Korea, where a similar policy is in progress under the new government. The CVM results show that a Korean household was willing to pay an additional KRW 1922.45/month (USD 1.80/month) for replacing seven 1-Gigawatt NPPs with other energy sources, which is about 3.5% of a household’s current electricity bill. The CBA suggests that the annual costs of replacing this amount of nuclear power capacity with renewables or liquefied natural gas is KRW 1291.40 billion (USD 1.21 billion) or KRW 1180.38 billion (USD 1.11 billion) larger than its benefits, which amounts to about 3% of total annual electricity generation costs in South Korea. As the additional costs of nuclear power replacement cannot be fully covered by the mean willingness-to-pay of the current acceptance level, moderate levels of social resistance are expected if all the additional costs are passed on to the end-users.