Some heuristic algorithms for total tardiness minimization in a flowshop with blocking
The flowshop scheduling problem with blocking in-process is addressed in this paper. In this environment, there are no buffers between successive machines; therefore intermediate queues of jobs waiting in the system for their next operations are not allowed. Heuristic approaches are proposed to mini...
Gespeichert in:
Veröffentlicht in: | Omega (Oxford) 2009-04, Vol.37 (2), p.272-281 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The flowshop scheduling problem with blocking in-process is addressed in this paper. In this environment, there are no buffers between successive machines; therefore intermediate queues of jobs waiting in the system for their next operations are not allowed. Heuristic approaches are proposed to minimize the total tardiness criterion. A constructive heuristic that explores specific characteristics of the problem is presented. Moreover, a GRASP-based heuristic is proposed and coupled with a path relinking strategy to search for better outcomes. Computational tests are presented and the comparisons made with an adaptation of the NEH algorithm and with a branch-and-bound algorithm indicate that the new approaches are promising. |
---|---|
ISSN: | 0305-0483 1873-5274 |
DOI: | 10.1016/j.omega.2007.01.003 |