Scheduling jobs in a contaminated area: a model and heuristic algorithms
Scheduling problems studied in this paper arise when some tasks have to be executed by human resources in an area contaminated with radio-active or chemical materials. The specificity of the problems is that each work period should be accompanied by a rest period whose length depends on the start ti...
Gespeichert in:
Veröffentlicht in: | The Journal of the Operational Research Society 2008-07, Vol.59 (7), p.977-987 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Scheduling problems studied in this paper arise when some tasks have to be executed by human resources in an area contaminated with radio-active or chemical materials. The specificity of the problems is that each work period should be accompanied by a rest period whose length depends on the start time of the corresponding work period. The dependency functions are exponentially decreasing ones. The problems with a single worker and criteria of minimizing maximum lateness or total weighted completion time are proved to be NP-hard. Heuristic algorithms for their solving are developed and computational experiments are provided. |
---|---|
ISSN: | 0160-5682 1476-9360 |
DOI: | 10.1057/palgrave.jors.2602406 |