Practical implementation within the electron cyclotron upper launcher of the French INB order of 2012

The ITER project is under construction in Cadarache, France, to assemble and operate an experimental nuclear fusion facility. The aim of this paper is the description of the implementation of the French Order of February 7, 2012, concerning Basic Nuclear Installation (also called “INB” Order) [1] wi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Fusion engineering and design 2019-09, Vol.146, p.273-276
Hauptverfasser: Wouters, P., Gagliardi, M., Saibene, G., Gracia, V., Mille, B., Benilan, I., Creus, E., La Rovere, S., Di Leva, N., Baldisserri, B., Vercilli, C., Castrillon Escobar, S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The ITER project is under construction in Cadarache, France, to assemble and operate an experimental nuclear fusion facility. The aim of this paper is the description of the implementation of the French Order of February 7, 2012, concerning Basic Nuclear Installation (also called “INB” Order) [1] within the European Union Domestic Agency (EU-DA), specifically on the Electron Cyclotron Upper Launcher (EC UL). The EC UL will be used for the control and heating of the ITER plasma. The launcher includes the port plug and related in-vessel items (nuclear shielding, blanket module, and optics) and the ex-vessel first confinement items (diamond window, isolation valve, waveguides, miterbends, tapers and port plug back end).
ISSN:0920-3796
1873-7196
DOI:10.1016/j.fusengdes.2018.12.044