Subjective benefit evaluation model for immature BIM-enabled stakeholders
Building Information Modeling (BIM) implementation brings many benefits for different stakeholders, but how to evaluate the benefits is still an unsolved problem. For dealing with the problem, this study proposes an overall benefit evaluation structure for BIM implementation, and then develops a sub...
Gespeichert in:
Veröffentlicht in: | Automation in construction 2019-10, Vol.106, p.102908, Article 102908 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Building Information Modeling (BIM) implementation brings many benefits for different stakeholders, but how to evaluate the benefits is still an unsolved problem. For dealing with the problem, this study proposes an overall benefit evaluation structure for BIM implementation, and then develops a subjective benefit evaluation model for immature BIM-enabled stakeholders by evaluating project-based benefits in three evaluation stages: pre-project, in-progress and post-project evaluations. Through an empirical study of thirteen BIM implementation cases in Taiwan, this study concludes that the proposed model is appropriate to evaluate project-based benefits for a stakeholder who is not familiar with BIM implementation. The research outcomes and findings of BIM benefits evaluation can assist those in the public and private sectors who have sensed the value of BIM and want to implement BIM technology. Further research to evaluate BIM benefits in different BIM implementation levels is needed.
•This study discusses benefit evaluation issues for BIM implementation systematically.•BIM implementation benefits are organized into six levels.•This study develops a benefit evaluation model for immature BIM-enabled stakeholders.•BIM benefits can be evaluated in pre-project, in-progress and post-project stages.•Research outcomes provide a benchmark for evaluating project-based BIM benefits. |
---|---|
ISSN: | 0926-5805 1872-7891 |
DOI: | 10.1016/j.autcon.2019.102908 |