Effects Analysis of Forced Cooling Rate on Microstructure, Tensile Strength and Hardness of Superheater Tube in Pulverized Coal Boiler
The availability (readiness) of a Steam Power Plant (PLTU) is an important factor, since one income from a Power Plant is based on its readiness reflected in the EAF (Equivalent Availibility Factor). Factor opposite to Availibility is Outage. Outage occurs when a unit is out of sync to a network and...
Gespeichert in:
Veröffentlicht in: | Materials science forum 2019-07, Vol.964, p.62-67 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The availability (readiness) of a Steam Power Plant (PLTU) is an important factor, since one income from a Power Plant is based on its readiness reflected in the EAF (Equivalent Availibility Factor). Factor opposite to Availibility is Outage. Outage occurs when a unit is out of sync to a network and not in a Reserve Shutdown state. |
---|---|