Effects Analysis of Forced Cooling Rate on Microstructure, Tensile Strength and Hardness of Superheater Tube in Pulverized Coal Boiler

The availability (readiness) of a Steam Power Plant (PLTU) is an important factor, since one income from a Power Plant is based on its readiness reflected in the EAF (Equivalent Availibility Factor). Factor opposite to Availibility is Outage. Outage occurs when a unit is out of sync to a network and...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Materials science forum 2019-07, Vol.964, p.62-67
Hauptverfasser: Sutikno, Sutikno, Andri, Andri
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The availability (readiness) of a Steam Power Plant (PLTU) is an important factor, since one income from a Power Plant is based on its readiness reflected in the EAF (Equivalent Availibility Factor). Factor opposite to Availibility is Outage. Outage occurs when a unit is out of sync to a network and not in a Reserve Shutdown state.
ISSN:0255-5476
1662-9752
1662-9752
DOI:10.4028/www.scientific.net/MSF.964.62