Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems

This paper highlights the importance of integration between process planning and scheduling in flexible manufacturing systems (FMS). An effective integration increases the potential for enhanced system performance and enhanced decision making A framework that integrates flexible process plans with o...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of advanced manufacturing technology 1999-01, Vol.15 (4), p.268-280
Hauptverfasser: Saygin, C., Kilic, S. E.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper highlights the importance of integration between process planning and scheduling in flexible manufacturing systems (FMS). An effective integration increases the potential for enhanced system performance and enhanced decision making A framework that integrates flexible process plans with off-line (predictive) scheduling in FMS is presented. The flexibility in process planning, including process flexibility, sequence flexibility, and alternative machine tools, is discussed. The proposed framework consists of four integrated stages with the objective of reducing the completion time. The integrated stages include:1. Machine tool selection.2. Process plan selection.3. Scheduling.4. Re-scheduling modules.In addition, the paper proposes a new approach, namely the Dissimilarity Maximisation Method (DMM), for selecting the appropriate process plans for a part mix where parts have alternative process plans. The recursive structure of the framework provides a different approach, namely overlapping schedules, which considers a longer scheduling period as comprising several short scheduling periods. Knowing that neither the process plans nor the planned (predicted) schedules are truly followed on the shop floor, the related literature and the corresponding approaches are compared in order to envisage new approaches for closing the gap between process planning and scheduling.
ISSN:0268-3768
1433-3015
DOI:10.1007/s001700050066