A heuristic algorithm for cell formation problems with consideration of multiple production factors
For the design of manufacturing cells, numerous mathematical models and various algorithms have been extensively investigated in the literature. However, most of the proposed models and algorithms have more or fewer drawbacks on the issues with real-life situations. In this paper, we propose a mathe...
Gespeichert in:
Veröffentlicht in: | International journal of advanced manufacturing technology 2010-02, Vol.46 (9-12), p.1201-1213 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | For the design of manufacturing cells, numerous mathematical models and various algorithms have been extensively investigated in the literature. However, most of the proposed models and algorithms have more or fewer drawbacks on the issues with real-life situations. In this paper, we propose a mathematical model that incorporates multiple key real-life production factors simultaneously, namely, production volume, batch size, alternative process routings and perfect coefficient of each routing, cell size, unit cost of intercell/intracell movements, and path coefficient of material flows. Then, to solve this NP-hard model, we develop a heuristic algorithm with three stages: (1) form the temporary machine group plan according to the alternative process routings of each part, (2) select the appropriate process routing of each part with respect to the over-all material movement cost, and (3) configure the regular manufacturing cells based on the appropriate process routing. A simple numerical example and an industrial case are used to test the computational performance of the proposed algorithm. The test results imply that it is useful for manufacturing cell design in both quality and speed. |
---|---|
ISSN: | 0268-3768 1433-3015 |
DOI: | 10.1007/s00170-009-2170-0 |