Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints

The unrelated parallel machine scheduling problem with sequence- and machine-dependent setup times in the presence of due date constraints represents an important but relatively less-studied scheduling problem in the literature. In this study, a simple iterated greedy (IG) heuristic is presented to...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of advanced manufacturing technology 2011-03, Vol.53 (1-4), p.353-361
Hauptverfasser: Lin, Shih-Wei, Lu, Chung-Cheng, Ying, Kuo-Ching
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The unrelated parallel machine scheduling problem with sequence- and machine-dependent setup times in the presence of due date constraints represents an important but relatively less-studied scheduling problem in the literature. In this study, a simple iterated greedy (IG) heuristic is presented to minimize the total tardiness of this scheduling problem. The effectiveness and efficiency of the proposed IG heuristic are compared with existing algorithms on a benchmark problem dataset used in earlier studies. Extensive computational results indicate that the proposed IG heuristic is capable of obtaining significantly better solutions than the state-of-the-art algorithms on the same benchmark problem dataset with similar computational resources.