Feasibility of ORC application in natural gas compressor stations
Natural gas compressor stations represent a huge potential in terms of waste heat recovery. Typical installations consist of multiple gas turbine units, in mechanical drive arrangement, operated most of the time under part-load conditions. The paper investigates the feasibility of Organic Rankine Cy...
Gespeichert in:
Veröffentlicht in: | Energy (Oxford) 2019-04, Vol.173, p.1-15 |
---|---|
Hauptverfasser: | , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Natural gas compressor stations represent a huge potential in terms of waste heat recovery. Typical installations consist of multiple gas turbine units, in mechanical drive arrangement, operated most of the time under part-load conditions. The paper investigates the feasibility of Organic Rankine Cycle application as bottomer recovery technology in natural gas compressor facilities. The aim of the performed analysis is to obtain a detailed techno-economic and environmental scenario of the integrated system on yearly base. Different commercial gas turbine models, in the size range from 3 to 30 MW, have been taken into account as representative of mechanical driver units. Bottomer configurations (with & without intermediate loop) are modelled and compared assuming two different organic fluids. A sensitivity analysis of the bottomer cycle is carried out aimed at maximizing ORC shaft power output for each investigated layout. Off-design part-load operation of the integrated cycles have been simulated with reference to one minute data typical GT operation on a yearly base. The goal of this work is: (i) to assess the actual performance of merging gas turbines and ORC units for efficient power generation under variable operating conditions; (ii) to analyze the real potential of state-of-the art technology in the proposed innovative application.
•Techno-economic investigation of ORC potential, in a real NG compression stations.•Retrofit with ORC commercial GTs, widely diffused in compression facilities.•Simulate part-load of selected GTs according to different control load strategies.•Investigate different organic fluids and topper-bottomer integrated layouts.•Define, for each GT-ORC layouts, optimal design and estimate off-design behavior. |
---|---|
ISSN: | 0360-5442 1873-6785 |
DOI: | 10.1016/j.energy.2019.01.127 |