Electrical Distribution Industry - Long Term Load Forecast on Ilesha Road 11kV Feeder, Akure, Ondo State, Nigeria
This paper presents an investigative study on a selected 11 kV distribution feeder network in Akure township, Nigeria, aimed at evaluating power distribution problems and solution proposals for effective application of existing 11 kV feeders for power supply within Nigeria. Based on peak loads recor...
Gespeichert in:
Veröffentlicht in: | International journal of engineering research in Africa (Print) 2018-08, Vol.37, p.52-61 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper presents an investigative study on a selected 11 kV distribution feeder network in Akure township, Nigeria, aimed at evaluating power distribution problems and solution proposals for effective application of existing 11 kV feeders for power supply within Nigeria. Based on peak loads recorded on the feeder for 8 years a long term load forecast up to 2021 was carried out using “Trend’ and “Growth’ functions in Excel worksheet. These functions use Method of Least Squares. The peak network load is 8 MW and the expected load in 2021 is 14.5 MW (18.5 MVA at 0.8 power factor) after an exponential growth rate of 0.6 MW per annum. There is need to increase the rating of the power transformer feeding the feeder in order to enhance the security power supply to the network. Furthermore, the Power Company must provide standard input voltage (1.05x11 kV) to the network in order to normalize end-users voltage quality. |
---|---|
ISSN: | 1663-3571 1663-4144 1663-4144 |
DOI: | 10.4028/www.scientific.net/JERA.37.52 |