Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
The e-plant chain is an extension of the integration beyond a production site by means of improved distribution management, electronic data interchange and coordination of multiple plants. The present paper proposes an advanced planning and scheduling model for the e-plant chain. The advanced planni...
Gespeichert in:
Veröffentlicht in: | International journal of production research 2004-08, Vol.42 (15), p.2941-2955 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The e-plant chain is an extension of the integration beyond a production site by means of improved distribution management, electronic data interchange and coordination of multiple plants. The present paper proposes an advanced planning and scheduling model for the e-plant chain. The advanced planning and scheduling is the most important function when supporting flexible planning and scheduling in the e-plant chain. The problem is formulated as a mixed integer-programming model. The model includes the main features of the system including flexible operations' sequences, resource requirements and alternative schedules. Since the problem is NP-hard, an intelligent search approach based on a genetic algorithm is developed. Numerical experiments show the proposed approach is satisfactory in its accuracy and efficiency. |
---|---|
ISSN: | 0020-7543 1366-588X |
DOI: | 10.1080/00207540410001691956 |