Minimizing weighted number of early and tardy jobs with a common due window involving location penalty

This paper studies a single machine scheduling problem to minimize the weighted number of early and tardy jobs with a common due window. There are n non-preemptive and simultaneously available jobs. Each job will incur an early (tardy) penalty if it is early (tardy) with respect to the common due wi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Annals of operations research 2001-11, Vol.108 (1), p.33
Hauptverfasser: Yeung, W K, uz, Ceyda Og, Cheng, T C Edwin
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper studies a single machine scheduling problem to minimize the weighted number of early and tardy jobs with a common due window. There are n non-preemptive and simultaneously available jobs. Each job will incur an early (tardy) penalty if it is early (tardy) with respect to the common due window under a given schedule. The window size is a given parameter but the window location is a decision variable. The objective of the problem is to find a schedule that minimizes the weighted number of early and tardy jobs and the location penalty. We show that the problem is NP-complete in the ordinary sense and develop a dynamic programming based pseudo-polynomial algorithm. We conduct computational experiments, the results of which show that the performance of the dynamic algorithm is very good in terms of memory requirement and CPU time. We also provide polynomial time algorithms for two special cases. [PUBLICATION ABSTRACT]
ISSN:0254-5330
1572-9338
DOI:10.1023/A:1016094508744