Heuristic procedure for assigning loads to power transmission buses on the space station

A procedure for assigning loads to power transmission buses on the initial orbit configuration space station so that a desired ratio of power flows on the buses can be achieved is presented. The procedure is heuristic, that is, it will generate a good but not an optimal assignment. The entire set of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & industrial engineering 1988, Vol.15 (1), p.392-397
1. Verfasser: Sheskin, Theodore J.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A procedure for assigning loads to power transmission buses on the initial orbit configuration space station so that a desired ratio of power flows on the buses can be achieved is presented. The procedure is heuristic, that is, it will generate a good but not an optimal assignment. The entire set of loads is partitioned into smaller groups, solutions are obtained recursively for the groups, and a solution for the whole set of loads is obtained. When the loads are assigned to a bus, the sum of the powers delivered to the loads equals the power provided at the bus. The proposed procedure is general enough to handle any reasonable number of buses. A computer program to execute the heuristic was written in Turbo Pascal for an IBM PC/AT. The load assignment program will become part of an evolving integrated software package that will enable a space station planner to schedule experiment payloads during each period of an orbit or a longer planning horizon.
ISSN:0360-8352
1879-0550
DOI:10.1016/0360-8352(88)90117-9