Capacity expansion of linked reservoir systems

A procedure is presented for the analysis of time phasing of reservoir system development. The formulation is based on a multi-purpose reservoir model with stochastic inflows. The object is to select the reservoir sizing, timing of expansion and to establish operating policies such that the total co...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & industrial engineering 1984, Vol.8 (2), p.119-128
Hauptverfasser: Helm, James C., Curry, Guy L., Hogg, Gary L.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A procedure is presented for the analysis of time phasing of reservoir system development. The formulation is based on a multi-purpose reservoir model with stochastic inflows. The object is to select the reservoir sizing, timing of expansion and to establish operating policies such that the total cost associated with the system of linked reservoirs is minimized. The capacity expansion aspect is formulated as a mixed integer continuous linear programming problem. Due to the resulting problem size and its general structure, Benders' decomposition is applied. A numerical example illustrating the procedure is given.
ISSN:0360-8352
1879-0550
DOI:10.1016/0360-8352(84)90004-4