Nigerian 330 kV 38-bus transmission network 10-year expansion planning under probabilistic load forecasts

The paper presents a 10-year expansion model for Nigerian 330 kV 38-bus transmission network that adequately accommodates probabilistic growing loads using heuristic time-step power flow simulations approach. Past network operation planning was based on assigned and deterministic load projections th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Electrical engineering 2018-12, Vol.100 (4), p.2717-2724
Hauptverfasser: Melodi, A. O., Momoh, J. A., Adeyanju, O. M.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 2724
container_issue 4
container_start_page 2717
container_title Electrical engineering
container_volume 100
creator Melodi, A. O.
Momoh, J. A.
Adeyanju, O. M.
description The paper presents a 10-year expansion model for Nigerian 330 kV 38-bus transmission network that adequately accommodates probabilistic growing loads using heuristic time-step power flow simulations approach. Past network operation planning was based on assigned and deterministic load projections that created transmission system performance inadequacy and load-shedding conditions under normal demands. The network simulator was created using NEPLAN software for electrical networks, and specific probabilistic loading model and contingency were applied to obtain the present and prospective system performance responses and expansion requirements. From an analysis of the obtained results, required transmission system reinforcements under the probabilistic loading model were established. The research findings are useful guides for effective transmission grid development in Nigeria.
doi_str_mv 10.1007/s00202-018-0735-3
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2133937371</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2133937371</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2313-266ac66881e7c70a874c9a5bf72eb55b9992aae12029fd7f1126b752b52ffb273</originalsourceid><addsrcrecordid>eNp1kE1OwzAQhS0EEuXnAOwssTaM7SSOl6jiT6pgA2wtO7Urt6kT7ETQ23AWToarILFiNdLMe29mPoQuKFxRAHGdABgwArQmIHhJ-AGa0YLnTlGLQzQDWdRESEaP0UlKawDgpSxmaP3kVzZ6HTDn8P21ecO8JmZMeIg6pK1PyXcBBzt8dHGDKZCd1RHbzz5P95O-1SH4sMJjWNqI-9gZbXzr0-Ab3HZ6iV0XbaPTkM7QkdNtsue_9RS93t2-zB_I4vn-cX6zIA3jlBNWVbqpqrqmVjQCdC2KRurSOMGsKUsjpWRaW5rflW4pHKWsMqJkpmTOGSb4KbqccvMx76NNg1p3Ywx5pWKUc8kFFzSr6KRqYpdStE710W913CkKao9UTUhVRqr2SBXPHjZ5UtaGzO0v-X_TD6hteZw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2133937371</pqid></control><display><type>article</type><title>Nigerian 330 kV 38-bus transmission network 10-year expansion planning under probabilistic load forecasts</title><source>Springer Nature - Complete Springer Journals</source><creator>Melodi, A. O. ; Momoh, J. A. ; Adeyanju, O. M.</creator><creatorcontrib>Melodi, A. O. ; Momoh, J. A. ; Adeyanju, O. M.</creatorcontrib><description>The paper presents a 10-year expansion model for Nigerian 330 kV 38-bus transmission network that adequately accommodates probabilistic growing loads using heuristic time-step power flow simulations approach. Past network operation planning was based on assigned and deterministic load projections that created transmission system performance inadequacy and load-shedding conditions under normal demands. The network simulator was created using NEPLAN software for electrical networks, and specific probabilistic loading model and contingency were applied to obtain the present and prospective system performance responses and expansion requirements. From an analysis of the obtained results, required transmission system reinforcements under the probabilistic loading model were established. The research findings are useful guides for effective transmission grid development in Nigeria.</description><identifier>ISSN: 0948-7921</identifier><identifier>EISSN: 1432-0487</identifier><identifier>DOI: 10.1007/s00202-018-0735-3</identifier><language>eng</language><publisher>Berlin/Heidelberg: Springer Berlin Heidelberg</publisher><subject>Computer simulation ; Contingency ; Data buses ; Economics and Management ; Electrical Engineering ; Electrical Machines and Networks ; Electrical networks ; Energy Policy ; Engineering ; Load ; Load shedding ; Original Paper ; Power Electronics ; Power flow ; Simulation</subject><ispartof>Electrical engineering, 2018-12, Vol.100 (4), p.2717-2724</ispartof><rights>Springer-Verlag GmbH Germany, part of Springer Nature 2018</rights><rights>Copyright Springer Science &amp; Business Media 2018</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c2313-266ac66881e7c70a874c9a5bf72eb55b9992aae12029fd7f1126b752b52ffb273</citedby><cites>FETCH-LOGICAL-c2313-266ac66881e7c70a874c9a5bf72eb55b9992aae12029fd7f1126b752b52ffb273</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://link.springer.com/content/pdf/10.1007/s00202-018-0735-3$$EPDF$$P50$$Gspringer$$H</linktopdf><linktohtml>$$Uhttps://link.springer.com/10.1007/s00202-018-0735-3$$EHTML$$P50$$Gspringer$$H</linktohtml><link.rule.ids>314,776,780,27903,27904,41467,42536,51298</link.rule.ids></links><search><creatorcontrib>Melodi, A. O.</creatorcontrib><creatorcontrib>Momoh, J. A.</creatorcontrib><creatorcontrib>Adeyanju, O. M.</creatorcontrib><title>Nigerian 330 kV 38-bus transmission network 10-year expansion planning under probabilistic load forecasts</title><title>Electrical engineering</title><addtitle>Electr Eng</addtitle><description>The paper presents a 10-year expansion model for Nigerian 330 kV 38-bus transmission network that adequately accommodates probabilistic growing loads using heuristic time-step power flow simulations approach. Past network operation planning was based on assigned and deterministic load projections that created transmission system performance inadequacy and load-shedding conditions under normal demands. The network simulator was created using NEPLAN software for electrical networks, and specific probabilistic loading model and contingency were applied to obtain the present and prospective system performance responses and expansion requirements. From an analysis of the obtained results, required transmission system reinforcements under the probabilistic loading model were established. The research findings are useful guides for effective transmission grid development in Nigeria.</description><subject>Computer simulation</subject><subject>Contingency</subject><subject>Data buses</subject><subject>Economics and Management</subject><subject>Electrical Engineering</subject><subject>Electrical Machines and Networks</subject><subject>Electrical networks</subject><subject>Energy Policy</subject><subject>Engineering</subject><subject>Load</subject><subject>Load shedding</subject><subject>Original Paper</subject><subject>Power Electronics</subject><subject>Power flow</subject><subject>Simulation</subject><issn>0948-7921</issn><issn>1432-0487</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><recordid>eNp1kE1OwzAQhS0EEuXnAOwssTaM7SSOl6jiT6pgA2wtO7Urt6kT7ETQ23AWToarILFiNdLMe29mPoQuKFxRAHGdABgwArQmIHhJ-AGa0YLnTlGLQzQDWdRESEaP0UlKawDgpSxmaP3kVzZ6HTDn8P21ecO8JmZMeIg6pK1PyXcBBzt8dHGDKZCd1RHbzz5P95O-1SH4sMJjWNqI-9gZbXzr0-Ab3HZ6iV0XbaPTkM7QkdNtsue_9RS93t2-zB_I4vn-cX6zIA3jlBNWVbqpqrqmVjQCdC2KRurSOMGsKUsjpWRaW5rflW4pHKWsMqJkpmTOGSb4KbqccvMx76NNg1p3Ywx5pWKUc8kFFzSr6KRqYpdStE710W913CkKao9UTUhVRqr2SBXPHjZ5UtaGzO0v-X_TD6hteZw</recordid><startdate>20181201</startdate><enddate>20181201</enddate><creator>Melodi, A. O.</creator><creator>Momoh, J. A.</creator><creator>Adeyanju, O. M.</creator><general>Springer Berlin Heidelberg</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20181201</creationdate><title>Nigerian 330 kV 38-bus transmission network 10-year expansion planning under probabilistic load forecasts</title><author>Melodi, A. O. ; Momoh, J. A. ; Adeyanju, O. M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2313-266ac66881e7c70a874c9a5bf72eb55b9992aae12029fd7f1126b752b52ffb273</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><topic>Computer simulation</topic><topic>Contingency</topic><topic>Data buses</topic><topic>Economics and Management</topic><topic>Electrical Engineering</topic><topic>Electrical Machines and Networks</topic><topic>Electrical networks</topic><topic>Energy Policy</topic><topic>Engineering</topic><topic>Load</topic><topic>Load shedding</topic><topic>Original Paper</topic><topic>Power Electronics</topic><topic>Power flow</topic><topic>Simulation</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Melodi, A. O.</creatorcontrib><creatorcontrib>Momoh, J. A.</creatorcontrib><creatorcontrib>Adeyanju, O. M.</creatorcontrib><collection>CrossRef</collection><jtitle>Electrical engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Melodi, A. O.</au><au>Momoh, J. A.</au><au>Adeyanju, O. M.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Nigerian 330 kV 38-bus transmission network 10-year expansion planning under probabilistic load forecasts</atitle><jtitle>Electrical engineering</jtitle><stitle>Electr Eng</stitle><date>2018-12-01</date><risdate>2018</risdate><volume>100</volume><issue>4</issue><spage>2717</spage><epage>2724</epage><pages>2717-2724</pages><issn>0948-7921</issn><eissn>1432-0487</eissn><abstract>The paper presents a 10-year expansion model for Nigerian 330 kV 38-bus transmission network that adequately accommodates probabilistic growing loads using heuristic time-step power flow simulations approach. Past network operation planning was based on assigned and deterministic load projections that created transmission system performance inadequacy and load-shedding conditions under normal demands. The network simulator was created using NEPLAN software for electrical networks, and specific probabilistic loading model and contingency were applied to obtain the present and prospective system performance responses and expansion requirements. From an analysis of the obtained results, required transmission system reinforcements under the probabilistic loading model were established. The research findings are useful guides for effective transmission grid development in Nigeria.</abstract><cop>Berlin/Heidelberg</cop><pub>Springer Berlin Heidelberg</pub><doi>10.1007/s00202-018-0735-3</doi><tpages>8</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0948-7921
ispartof Electrical engineering, 2018-12, Vol.100 (4), p.2717-2724
issn 0948-7921
1432-0487
language eng
recordid cdi_proquest_journals_2133937371
source Springer Nature - Complete Springer Journals
subjects Computer simulation
Contingency
Data buses
Economics and Management
Electrical Engineering
Electrical Machines and Networks
Electrical networks
Energy Policy
Engineering
Load
Load shedding
Original Paper
Power Electronics
Power flow
Simulation
title Nigerian 330 kV 38-bus transmission network 10-year expansion planning under probabilistic load forecasts
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T12%3A47%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Nigerian%20330%C2%A0kV%2038-bus%20transmission%20network%2010-year%20expansion%20planning%20under%20probabilistic%20load%20forecasts&rft.jtitle=Electrical%20engineering&rft.au=Melodi,%20A.%20O.&rft.date=2018-12-01&rft.volume=100&rft.issue=4&rft.spage=2717&rft.epage=2724&rft.pages=2717-2724&rft.issn=0948-7921&rft.eissn=1432-0487&rft_id=info:doi/10.1007/s00202-018-0735-3&rft_dat=%3Cproquest_cross%3E2133937371%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2133937371&rft_id=info:pmid/&rfr_iscdi=true