Simulation of tunneling construction methods of the Cisumdawu toll road

Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This pap...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Abduh, Muhamad, Sukardi, Sapto Nugroho, Ola, Muhammad Rusdian La, Ariesty, Anita, Wirahadikusumah, Reini D.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 1
container_start_page
container_title
container_volume 1903
creator Abduh, Muhamad
Sukardi, Sapto Nugroho
Ola, Muhammad Rusdian La
Ariesty, Anita
Wirahadikusumah, Reini D.
description Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction & building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.
doi_str_mv 10.1063/1.5011583
format Conference Proceeding
fullrecord <record><control><sourceid>proquest_scita</sourceid><recordid>TN_cdi_proquest_journals_2116053946</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2116053946</sourcerecordid><originalsourceid>FETCH-LOGICAL-p288t-15e3c0561fd192981c428826dd80ab8a1621cb298fa3fc3515ec71d7974a84923</originalsourceid><addsrcrecordid>eNp9kE9LxDAQxYMouK4e_AYFb0LXTNKkyVEWXYUFDyp4C9mkdbu0Tc0fxW9v7S548zTw3m_eMA-hS8ALwJzewIJhACboEZoBY5CXHPgxmmEsi5wU9O0UnYWww5jIshQztHpuutTq2Lg-c3UWU99XbdO_Z8b1IfpkJqer4tbZMBHbKls2IXVWf6UsurbNvNP2HJ3Uug3VxWHO0ev93cvyIV8_rR6Xt-t8IELEHFhFDWYcaguSSAGmGHXCrRVYb4QGTsBsRqPWtDaUjbwpwZayLLQoJKFzdLXPHbz7SFWIaueS78eTigBwzKgs-Ehd76lgmjg9pwbfdNp_q0_nFahDSWqw9X8wYPXb6t8C_QEW_WiD</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype><pqid>2116053946</pqid></control><display><type>conference_proceeding</type><title>Simulation of tunneling construction methods of the Cisumdawu toll road</title><source>AIP Journals Complete</source><creator>Abduh, Muhamad ; Sukardi, Sapto Nugroho ; Ola, Muhammad Rusdian La ; Ariesty, Anita ; Wirahadikusumah, Reini D.</creator><contributor>Saloma</contributor><creatorcontrib>Abduh, Muhamad ; Sukardi, Sapto Nugroho ; Ola, Muhammad Rusdian La ; Ariesty, Anita ; Wirahadikusumah, Reini D. ; Saloma</creatorcontrib><description>Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction &amp; building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.</description><identifier>ISSN: 0094-243X</identifier><identifier>EISSN: 1551-7616</identifier><identifier>DOI: 10.1063/1.5011583</identifier><identifier>CODEN: APCPCS</identifier><language>eng</language><publisher>Melville: American Institute of Physics</publisher><subject>Computer simulation ; Construction costs ; Construction methods ; Cost analysis ; Cyclones ; Literature reviews ; Norwegian Method of Tunnelling ; Productivity ; Project finance ; Simulation ; Toll roads ; Tunnel construction ; Websites</subject><ispartof>AIP Conference Proceedings, 2017, Vol.1903 (1)</ispartof><rights>Author(s)</rights><rights>2017 Author(s). Published by AIP Publishing.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://pubs.aip.org/acp/article-lookup/doi/10.1063/1.5011583$$EHTML$$P50$$Gscitation$$H</linktohtml><link.rule.ids>309,310,314,780,784,789,790,794,4512,23930,23931,25140,27924,27925,76384</link.rule.ids></links><search><contributor>Saloma</contributor><creatorcontrib>Abduh, Muhamad</creatorcontrib><creatorcontrib>Sukardi, Sapto Nugroho</creatorcontrib><creatorcontrib>Ola, Muhammad Rusdian La</creatorcontrib><creatorcontrib>Ariesty, Anita</creatorcontrib><creatorcontrib>Wirahadikusumah, Reini D.</creatorcontrib><title>Simulation of tunneling construction methods of the Cisumdawu toll road</title><title>AIP Conference Proceedings</title><description>Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction &amp; building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.</description><subject>Computer simulation</subject><subject>Construction costs</subject><subject>Construction methods</subject><subject>Cost analysis</subject><subject>Cyclones</subject><subject>Literature reviews</subject><subject>Norwegian Method of Tunnelling</subject><subject>Productivity</subject><subject>Project finance</subject><subject>Simulation</subject><subject>Toll roads</subject><subject>Tunnel construction</subject><subject>Websites</subject><issn>0094-243X</issn><issn>1551-7616</issn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2017</creationdate><recordtype>conference_proceeding</recordtype><recordid>eNp9kE9LxDAQxYMouK4e_AYFb0LXTNKkyVEWXYUFDyp4C9mkdbu0Tc0fxW9v7S548zTw3m_eMA-hS8ALwJzewIJhACboEZoBY5CXHPgxmmEsi5wU9O0UnYWww5jIshQztHpuutTq2Lg-c3UWU99XbdO_Z8b1IfpkJqer4tbZMBHbKls2IXVWf6UsurbNvNP2HJ3Uug3VxWHO0ev93cvyIV8_rR6Xt-t8IELEHFhFDWYcaguSSAGmGHXCrRVYb4QGTsBsRqPWtDaUjbwpwZayLLQoJKFzdLXPHbz7SFWIaueS78eTigBwzKgs-Ehd76lgmjg9pwbfdNp_q0_nFahDSWqw9X8wYPXb6t8C_QEW_WiD</recordid><startdate>20171114</startdate><enddate>20171114</enddate><creator>Abduh, Muhamad</creator><creator>Sukardi, Sapto Nugroho</creator><creator>Ola, Muhammad Rusdian La</creator><creator>Ariesty, Anita</creator><creator>Wirahadikusumah, Reini D.</creator><general>American Institute of Physics</general><scope>8FD</scope><scope>H8D</scope><scope>L7M</scope></search><sort><creationdate>20171114</creationdate><title>Simulation of tunneling construction methods of the Cisumdawu toll road</title><author>Abduh, Muhamad ; Sukardi, Sapto Nugroho ; Ola, Muhammad Rusdian La ; Ariesty, Anita ; Wirahadikusumah, Reini D.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p288t-15e3c0561fd192981c428826dd80ab8a1621cb298fa3fc3515ec71d7974a84923</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2017</creationdate><topic>Computer simulation</topic><topic>Construction costs</topic><topic>Construction methods</topic><topic>Cost analysis</topic><topic>Cyclones</topic><topic>Literature reviews</topic><topic>Norwegian Method of Tunnelling</topic><topic>Productivity</topic><topic>Project finance</topic><topic>Simulation</topic><topic>Toll roads</topic><topic>Tunnel construction</topic><topic>Websites</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Abduh, Muhamad</creatorcontrib><creatorcontrib>Sukardi, Sapto Nugroho</creatorcontrib><creatorcontrib>Ola, Muhammad Rusdian La</creatorcontrib><creatorcontrib>Ariesty, Anita</creatorcontrib><creatorcontrib>Wirahadikusumah, Reini D.</creatorcontrib><collection>Technology Research Database</collection><collection>Aerospace Database</collection><collection>Advanced Technologies Database with Aerospace</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Abduh, Muhamad</au><au>Sukardi, Sapto Nugroho</au><au>Ola, Muhammad Rusdian La</au><au>Ariesty, Anita</au><au>Wirahadikusumah, Reini D.</au><au>Saloma</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Simulation of tunneling construction methods of the Cisumdawu toll road</atitle><btitle>AIP Conference Proceedings</btitle><date>2017-11-14</date><risdate>2017</risdate><volume>1903</volume><issue>1</issue><issn>0094-243X</issn><eissn>1551-7616</eissn><coden>APCPCS</coden><abstract>Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction &amp; building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.</abstract><cop>Melville</cop><pub>American Institute of Physics</pub><doi>10.1063/1.5011583</doi><tpages>10</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 0094-243X
ispartof AIP Conference Proceedings, 2017, Vol.1903 (1)
issn 0094-243X
1551-7616
language eng
recordid cdi_proquest_journals_2116053946
source AIP Journals Complete
subjects Computer simulation
Construction costs
Construction methods
Cost analysis
Cyclones
Literature reviews
Norwegian Method of Tunnelling
Productivity
Project finance
Simulation
Toll roads
Tunnel construction
Websites
title Simulation of tunneling construction methods of the Cisumdawu toll road
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T23%3A07%3A21IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_scita&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Simulation%20of%20tunneling%20construction%20methods%20of%20the%20Cisumdawu%20toll%20road&rft.btitle=AIP%20Conference%20Proceedings&rft.au=Abduh,%20Muhamad&rft.date=2017-11-14&rft.volume=1903&rft.issue=1&rft.issn=0094-243X&rft.eissn=1551-7616&rft.coden=APCPCS&rft_id=info:doi/10.1063/1.5011583&rft_dat=%3Cproquest_scita%3E2116053946%3C/proquest_scita%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2116053946&rft_id=info:pmid/&rfr_iscdi=true