Simulation of tunneling construction methods of the Cisumdawu toll road

Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This pap...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Abduh, Muhamad, Sukardi, Sapto Nugroho, Ola, Muhammad Rusdian La, Ariesty, Anita, Wirahadikusumah, Reini D.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction & building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.
ISSN:0094-243X
1551-7616
DOI:10.1063/1.5011583