Limitations on the Rate of Impoundment and Drawdown of a Concrete Dam Reservoir (Example of the Arch-Gravity Dam of the Sayano-Shushenskaya HPP)
Reasons are examined for the necessity of eliminating restrictions on the speed of impoundment (drawdown) of a reservoir, ensuring safe operation of the structure. The effect of the rate of change of the HWL on the rate of change of radial displacements of a dam is studied. It is shown that increasi...
Gespeichert in:
Veröffentlicht in: | Power technology and engineering 2018-05, Vol.52 (1), p.39-46 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Reasons are examined for the necessity of eliminating restrictions on the speed of impoundment (drawdown) of a reservoir, ensuring safe operation of the structure. The effect of the rate of change of the HWL on the rate of change of radial displacements of a dam is studied. It is shown that increasing the rate of reservoir impoundment does not worsen the stress-strain state of the structure. |
---|---|
ISSN: | 1570-145X 1570-1468 |
DOI: | 10.1007/s10749-018-0907-3 |