Key risks in the supply chain of large scale engineering and construction projects

Purpose Large-scale projects are the typical delivery model in the engineering and construction industry, with their very own characteristics. Even though well established, only 1 in 1,000 large-scale projects is successful (Flyvbjerg, 2011). A lack of effective supply chain risk management (SCRM) h...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Supply chain management 2018-08, Vol.23 (4), p.336-350
Hauptverfasser: Rudolf, Christian A, Spinler, Stefan
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Purpose Large-scale projects are the typical delivery model in the engineering and construction industry, with their very own characteristics. Even though well established, only 1 in 1,000 large-scale projects is successful (Flyvbjerg, 2011). A lack of effective supply chain risk management (SCRM) has repeatedly been identified as one of the main causes. While the SCRM body of knowledge seems increasingly well established, a lack of effective methods meeting the specific requirements of large-scale projects can be observed. Design/methodology/approach This paper presents a structured and prioritized view on the supply chain risk portfolio in this sector: first, the authors identified and categorized the key supply chain risks in the recent literature. Next, the authors surveyed large-scale project managers across multiple industries, mainly coming from the domains of supply chain management and project management. Finally, the authors provide a contextualized risk taxonomy for engineering, procurement and construction (EPC) projects. Findings The identified risk portfolio deviates from generic projects significantly and shows a very high inherent risk exposure of large-scale projects. In particular, behavioral risks are identified as crucial. Additionally, a bias to considerably underestimate risks at project beginning is found. Originality/value The contextualized SCRM taxonomy offers a systematic and structured view on the key supply chain risks in EPC large-scale projects. The identified risks are considerably different in their characteristics compared to generic projects or classical SCRM approaches. The authors thus provide a new perspective on SCRM in this specific setting and complement traditional risk and project risk management techniques.
ISSN:1359-8546
1758-6852
DOI:10.1108/SCM-09-2017-0292