Optimization process of organic matter removal from wastewater by using Eichhornia crassipes

This study aimed to determine the optimal conditions for organic matter removal from wastewater by Eichhornia crassipes (E.C). As a matter of fact, a complete factorial design was used to determine the effect of residence time ( X 1 ), plant density ( X 2 ) and initial chemical oxygen demand (COD) c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Environmental science and pollution research international 2018-10, Vol.25 (29), p.29219-29226
Hauptverfasser: Mahunon, Sènandémi Edwige Reine, Aina, Martin Pépin, Akowanou, Akuemaho Virgile Onésime, Kouassi, Edmond Konan, Yao, Benjamin Kouassi, Adouby, Kopoin, Drogui, Patrick
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This study aimed to determine the optimal conditions for organic matter removal from wastewater by Eichhornia crassipes (E.C). As a matter of fact, a complete factorial design was used to determine the effect of residence time ( X 1 ), plant density ( X 2 ) and initial chemical oxygen demand (COD) concentration ( X 3 ) on the phytoremediation process. The process’s performance was measured on COD ( Y 1 ), NH 4 + ( Y 2 ) and PO 4 3− ( Y 3 ), with the results indicating a reduction of 8.59–81.71% of COD ( Y 1 ); 22.53–95.81% of NH 4 + ( Y 2 ) and 0.54–99.35% of PO 4 3− ( Y 3 ). Then, the first-order models obtained for COD, NH 4 + and PO 4 3− removal were validated using different statistical approaches such as statistical and experimental validation. Moreover, multi-response optimization was carried out through different scenarios. On the whole, the results obtained indicated that two serial ponds are required for an optimum organic matter removal by Eichhornia crassipes . Indeed, for the first pond, a residence time of 15 days is needed with a plant density of 60 ft/m 2 and an initial concentration of about 944 mg/L. The second was the same residence time as the first with similar plant density of 60 ft/m 2 and an initial load 192 mg/L (> 200 mg/L). Optimal organic matter removal from wastewater using Eichhornia crassipes requires two ponds arranged in chain.
ISSN:0944-1344
1614-7499
DOI:10.1007/s11356-018-2771-y