Current Status of the SANAEM RFQ Accelerator Beamline
The design and production studies of the proton beamline of SPP, which aims to acquire know-how on proton accelerator technology thru development of man power and serves as particle accelerator technologies test bench, continue at TAEK-SANAEM as a multi-phase project. For the first phase, 20 keV pro...
Gespeichert in:
Veröffentlicht in: | arXiv.org 2015-09 |
---|---|
Hauptverfasser: | , , , , , , , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The design and production studies of the proton beamline of SPP, which aims to acquire know-how on proton accelerator technology thru development of man power and serves as particle accelerator technologies test bench, continue at TAEK-SANAEM as a multi-phase project. For the first phase, 20 keV protons will be accelerated to 1.3 MeV by a single piece RFQ. Currently, the beam current and stability tests are ongoing for the Inductively Coupled Plasma ion source. The measured magnetic field maps of the Low Energy Beam Transport solenoids are being used for matching various beam configurations of the ion source to the RFQ by computer simulations. The installation of the low energy diagnostics box was completed in Q1 of 2015. The production of the RFQ cavity was started with aluminum 7075-T6 which will be subsequently coated by Copper to reduce the RF (Ohmic) losses. On the RF side, the development of the hybrid power supply based on solid state and tetrode amplifiers continues. All RF transmission components have already produced with the exception of the circulator and the power coupling antenna which are in the manufacturing and design phases, respectively. The acceptance tests of the produced RF components are ongoing. This work summarizes the design, production and test phases of the above-mentioned SPP proton beamline components. |
---|---|
ISSN: | 2331-8422 |