Optimization analysis for design and planning of multi-project programs

Program management concerns the long term planning, coordination, and control of major technological, engineering, scientific, and/or developmental activities. In general, programs tend to be exceptionally large, consisting of several parallel or sequential projects or groups of projects. While a la...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:European journal of operational research 1998-06, Vol.107 (2), p.492-506
Hauptverfasser: Wiley, Victor D., Deckro, Richard F., Jackson, Jack A.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Program management concerns the long term planning, coordination, and control of major technological, engineering, scientific, and/or developmental activities. In general, programs tend to be exceptionally large, consisting of several parallel or sequential projects or groups of projects. While a large number of modeling efforts have focused at the project level, this paper looks at the application of optimization techniques to the initial design and development of multi-project programs. The classic work breakdown structure (WBS) is used as a framework to provide an aggregate model to investigate the effects of funding levels, resource allocation, and program, project, and component durations. Decomposition, sensitivity analysis, and parametric programming are utilized to provide the decision maker detailed information for establishing program parameters, conditions, and bounds.