Multi-objective time–cost trade-off in dynamic PERT networks using an interactive approach

We develop a multi-objective model for the time–cost trade-off problem in a dynamic PERT network using an interactive approach. The activity durations are exponentially distributed random variables and the new projects are generated according to a renewal process and share the same facilities. Thus,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:European journal of operational research 2007-08, Vol.180 (3), p.1186-1200
Hauptverfasser: Azaron, Amir, Tavakkoli-Moghaddam, Reza
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We develop a multi-objective model for the time–cost trade-off problem in a dynamic PERT network using an interactive approach. The activity durations are exponentially distributed random variables and the new projects are generated according to a renewal process and share the same facilities. Thus, these projects cannot be analyzed independently. This dynamic PERT network is represented as a network of queues, where the service times represent the durations of the corresponding activities and the arrival stream to each node follows a renewal process. At the first stage, we transform the dynamic PERT network into a proper stochastic network and then compute the project completion time distribution by constructing a continuous-time Markov chain. At the second stage, the time–cost trade-off problem is formulated as a multi-objective optimal control problem that involves four conflicting objective functions. Then, the STEM method is used to solve a discrete-time approximation of the original problem. Finally, the proposed methodology is extended to the generalized Erlang activity durations.
ISSN:0377-2217
1872-6860
DOI:10.1016/j.ejor.2006.05.014