Multi-objective time–cost trade-off in dynamic PERT networks using an interactive approach
We develop a multi-objective model for the time–cost trade-off problem in a dynamic PERT network using an interactive approach. The activity durations are exponentially distributed random variables and the new projects are generated according to a renewal process and share the same facilities. Thus,...
Gespeichert in:
Veröffentlicht in: | European journal of operational research 2007-08, Vol.180 (3), p.1186-1200 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | We develop a multi-objective model for the time–cost trade-off problem in a dynamic PERT network using an interactive approach. The activity durations are exponentially distributed random variables and the new projects are generated according to a renewal process and share the same facilities. Thus, these projects cannot be analyzed independently. This dynamic PERT network is represented as a network of queues, where the service times represent the durations of the corresponding activities and the arrival stream to each node follows a renewal process. At the first stage, we transform the dynamic PERT network into a proper stochastic network and then compute the project completion time distribution by constructing a continuous-time Markov chain. At the second stage, the time–cost trade-off problem is formulated as a multi-objective optimal control problem that involves four conflicting objective functions. Then, the STEM method is used to solve a discrete-time approximation of the original problem. Finally, the proposed methodology is extended to the generalized Erlang activity durations. |
---|---|
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/j.ejor.2006.05.014 |