Minimizing makespan with multiple-orders-per-job in a two-machine flowshop
We investigate a new scheduling problem, multiple-orders-per-job (MOJ), in the context of a two-machine flowshop. Lower bounds for the makespan performance measure are provided for combinations of lot-processing and item-processing machines. An optimization model is presented that addresses both job...
Gespeichert in:
Veröffentlicht in: | European journal of operational research 2007-10, Vol.182 (1), p.63-79 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | We investigate a new scheduling problem, multiple-orders-per-job (MOJ), in the context of a two-machine flowshop. Lower bounds for the makespan performance measure are provided for combinations of lot-processing and item-processing machines. An optimization model is presented that addresses both job formation and job sequencing. We define a heuristic to minimize the makespan for the MOJ problem for two-machine item-processing flowshops. The heuristic obtains solutions within 2% of a tight lower bound and runs in
O(
HF) time, where
H is the number of orders and
F is the restricted number of jobs. |
---|---|
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/j.ejor.2006.07.023 |