A complex time based construction heuristic for batch scheduling problems in the chemical industry

In this paper we investigate a heuristic for batch processing problems occurring in the chemical industry, where the objective is to minimize the makespan. Usually, this kind of problem is solved using mixed-integer linear programs. However, due to the large number of binary variables good results w...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:European journal of operational research 2006-10, Vol.174 (2), p.1162-1183
Hauptverfasser: Burkard, Rainer E., Hatzl, Johannes
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper we investigate a heuristic for batch processing problems occurring in the chemical industry, where the objective is to minimize the makespan. Usually, this kind of problem is solved using mixed-integer linear programs. However, due to the large number of binary variables good results within a reasonable computational time could only be obtained for small instances. We propose an iterative construction algorithm which alternates between construction and deconstruction phases. Moreover, we suggest diversification and intensification strategies in order to obtain good suboptimal solutions within moderate running times. Computational results show the power of this algorithm.
ISSN:0377-2217
1872-6860
DOI:10.1016/j.ejor.2005.03.011