Toward participatory decision-making in river corridor management: two case studies from the European Alps
River managers are aware that river restoration entails addressing and effectively solving wicked social-ecological problems. Contemporary river corridor management is characterized by a variety of actors with different perspectives and interests, and by complex institutional settings and legal land...
Gespeichert in:
Veröffentlicht in: | Journal of environmental planning and management 2018-06, Vol.61 (7), p.1250-1270 |
---|---|
Hauptverfasser: | , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | River managers are aware that river restoration entails addressing and effectively solving wicked social-ecological problems. Contemporary river corridor management is characterized by a variety of actors with different perspectives and interests, and by complex institutional settings and legal landscapes. Additionally, at the intersection between litho-, hydro-, and biological fields, new research suggests that river restoration should reactivate matter and energy fluxes, re-establish spatial connections with the floodplains, and enhance aquatic and terrestrial habitats without exacerbating flood risk. First, we outline a general structure of participatory river corridor management that addresses the following key requirements: (1) unambiguous, participatory spatial delineation of the river corridor; (2) comprehensive assessment of the river corridor's hydro-geomorphological, ecological, socio-economic and cultural processes; (3) transparency and consistency of the decision-making process; as well as (4) a coherent envisioning process. Subsequently, we present an overview of two river corridor management processes, conducted in South Tyrol, Italy. Specifically, we analysed the Etsch/Adige River corridor between Laas/Lasa and Glurns/Glorenza in the Upper Vinschgau/Venosta valley characterized by intense agricultural land use and the densely populated Eisack/Isarco River corridor in Brixen/Bressanone. Based on structured interviews with project managers, we highlight strengths and shortcomings of the proposed participatory management and envisage procedural improvements. |
---|---|
ISSN: | 0964-0568 1360-0559 |
DOI: | 10.1080/09640568.2017.1339593 |