Method of Shaping Loading-and-Transportation System in Deep Open Pit Complex Ore Mines
The article presents a procedure to select loading and transportation machines for an open pit complex ore mine. The choice of a shovel–dump truck production system is validated using a statistical testing method (Monte Carlo technique). Stop-watch readings allowed relating the productivity of the p...
Gespeichert in:
Veröffentlicht in: | Journal of mining science 2018-07, Vol.53 (4), p.708-717 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The article presents a procedure to select loading and transportation machines for an open pit complex ore mine. The choice of a shovel–dump truck production system is validated using a statistical testing method (Monte Carlo technique). Stop-watch readings allowed relating the productivity of the production system, degree of ore fragmentation and content of oversizes; the soundness of the choice of the production system based on the revealed criterion was proved. Using the law of the Palm flows, the authors determine the number and sequence of dump trucks for loading in a one-server system. |
---|---|
ISSN: | 1062-7391 1573-8736 |
DOI: | 10.1134/S1062739117042702 |