A heuristic algorithm to minimize total weighted tardiness on a single machine with release times

This paper attempts to solve a single machine‐scheduling problem, in which the objective function is to minimize the total weighted tardiness with different release dates of jobs. To address this scheduling problem, a heuristic scheduling algorithm is presented. A mathematical programming formulatio...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International transactions in operational research 2005-03, Vol.12 (2), p.215-233
Hauptverfasser: Chou, Fuh-Der, Chang, Tzu-Yun, Lee, Ching-En
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper attempts to solve a single machine‐scheduling problem, in which the objective function is to minimize the total weighted tardiness with different release dates of jobs. To address this scheduling problem, a heuristic scheduling algorithm is presented. A mathematical programming formulation is also formulated to validate the performance of the heuristic scheduling algorithm proposed herein. Experimental results show that the proposed heuristic algorithm can solve this problem rapidly and accurately. Overall, this algorithm can find the optimal solutions for 2200 out of 2400 randomly generated problems (91.67%). For the most complicated 20 job cases, it requires less than 0.0016 s to obtain an ultimate or even optimal solution. This heuristic scheduling algorithm can therefore efficiently solve this kind of problem.
ISSN:0969-6016
1475-3995
DOI:10.1111/j.1475-3995.2005.00499.x