Group maintenance policies for an R-out-of-N system with phase-type distribution
This paper presents an extension of our earlier paper on the 1-out-of- N repairable cold standby system (i.e., Barron IIE Trans 47:1139–1151, 2015 ). Specifically, we consider an R -out-of- N repairable system where the lifetimes of the units follow phase-type distribution. The system is functioning...
Gespeichert in:
Veröffentlicht in: | Annals of operations research 2018-02, Vol.261 (1-2), p.79-105 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper presents an extension of our earlier paper on the 1-out-of-
N
repairable cold standby system (i.e., Barron IIE Trans 47:1139–1151,
2015
). Specifically, we consider an
R
-out-of-
N
repairable system where the lifetimes of the units follow phase-type distribution. The system is functioning if at least
R
out of its
N
components work. Each working component is subject to failure. There are fixed, unit repair, and replacement costs associated with the maintenance facility, which is carried out after a fixed lead time
τ
. A penalty cost is incurred when the number of good components decreases to
R
-
1
. We assume that the repair takes no time and repaired units are as good as new. By applying renewal theory and matrix-geometric methods, we derive the expected discounted costs under three classes of group maintenance policies:
m
-failure,
T
-age, and (
m
,
T
,
τ
), which is a refinement of the classical (
m
,
T
) policy. Illustrative examples, a comparative study and insights are provided. |
---|---|
ISSN: | 0254-5330 1572-9338 |
DOI: | 10.1007/s10479-017-2617-x |