Production planning and scheduling for injection moulding of pipe fittings A case study
The present study considers the development of a production planning and scheduling model for injection moulding of PVC pipe fittings in a local factory. The objective is to minimize the total costs of production, inventory, and shortages. A three-stage sequential procedure is used to solve the prob...
Gespeichert in:
Veröffentlicht in: | International journal of production economics 1997-11, Vol.53 (2), p.157-170 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 170 |
---|---|
container_issue | 2 |
container_start_page | 157 |
container_title | International journal of production economics |
container_volume | 53 |
creator | Nagarur, Nagen Vrat, Prem Duongsuwan, Wanchai |
description | The present study considers the development of a production planning and scheduling model for injection moulding of PVC pipe fittings in a local factory. The objective is to minimize the total costs of production, inventory, and shortages. A three-stage sequential procedure is used to solve the problem. The total problem domain is divided into three subproblems by mould-machine grouping. Each subproblem is then solved as a single-machine, multi-product, capacity lot-sizing problem, with a three-month planning horizon. A linear, zero-one goal programming approach is used to generate the solution. Finally, the production plan of the first month is decomposed and scheduling for each individual machine is carried out by a heuristic procedure. Comparison of the results show that the new procedure can substantially reduce both shortage and inventory costs. |
doi_str_mv | 10.1016/S0925-5273(97)00109-6 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_198989018</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0925527397001096</els_id><sourcerecordid>25738611</sourcerecordid><originalsourceid>FETCH-LOGICAL-c432t-7e6f111c2d53411bd94189182e5aa89d00374d6a82b7eba9bd22b25be89c2d363</originalsourceid><addsrcrecordid>eNqFkFFrFTEQhUNR6LX6E4TQJ31YzSQ3m-RJSmlrS0FBxceQTWbbXO7drMlu4f57s13pq4RJmOGcM-Ej5D2wT8Cg_fyDGS4byZX4YNRHxoCZpj0hG9BKNEoq84psXiSn5E0pO8aYAq035Pf3nMLsp5gGOu7dMMThgboh0OIfMcz7pe1TpnHY4ao6pHkflnHq6RhHpH2cptoXekG9K0jLNIfjW_K6d_uC7_69Z-TX9dXPy6_N_beb28uL-8ZvBZ8ahW0PAJ4HKbYAXTBb0AY0R-mcNoExobahdZp3CjtnusB5x2WH2lSPaMUZOV9zx5z-zFgmu0tzHupKC0bXw0BXkVxFPqdSMvZ2zPHg8tECswtC-4zQLnysUfYZoV3C71ZfxhH9iwkR6zb0yT5Z4aSo17EWmGoVLtbitcZlJJUFxezjdKhhX9YwrDieImZbfMTBY4i5orUhxf985y8YzpH1</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>198989018</pqid></control><display><type>article</type><title>Production planning and scheduling for injection moulding of pipe fittings A case study</title><source>RePEc</source><source>Elsevier ScienceDirect Journals</source><creator>Nagarur, Nagen ; Vrat, Prem ; Duongsuwan, Wanchai</creator><creatorcontrib>Nagarur, Nagen ; Vrat, Prem ; Duongsuwan, Wanchai</creatorcontrib><description>The present study considers the development of a production planning and scheduling model for injection moulding of PVC pipe fittings in a local factory. The objective is to minimize the total costs of production, inventory, and shortages. A three-stage sequential procedure is used to solve the problem. The total problem domain is divided into three subproblems by mould-machine grouping. Each subproblem is then solved as a single-machine, multi-product, capacity lot-sizing problem, with a three-month planning horizon. A linear, zero-one goal programming approach is used to generate the solution. Finally, the production plan of the first month is decomposed and scheduling for each individual machine is carried out by a heuristic procedure. Comparison of the results show that the new procedure can substantially reduce both shortage and inventory costs.</description><identifier>ISSN: 0925-5273</identifier><identifier>EISSN: 1873-7579</identifier><identifier>DOI: 10.1016/S0925-5273(97)00109-6</identifier><identifier>CODEN: IJPCEY</identifier><language>eng</language><publisher>Amsterdam: Elsevier B.V</publisher><subject>Goal programming ; Heuristic ; Inventory control ; Molding ; Moulding ; Operations research ; Plastics industry ; Production planning ; Production scheduling ; Scheduling ; Studies</subject><ispartof>International journal of production economics, 1997-11, Vol.53 (2), p.157-170</ispartof><rights>1997</rights><rights>Copyright Elsevier Sequoia S.A. Nov 20, 1997</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c432t-7e6f111c2d53411bd94189182e5aa89d00374d6a82b7eba9bd22b25be89c2d363</citedby><cites>FETCH-LOGICAL-c432t-7e6f111c2d53411bd94189182e5aa89d00374d6a82b7eba9bd22b25be89c2d363</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0925527397001096$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3536,3993,27903,27904,65309</link.rule.ids><backlink>$$Uhttp://econpapers.repec.org/article/eeeproeco/v_3a53_3ay_3a1997_3ai_3a2_3ap_3a157-170.htm$$DView record in RePEc$$Hfree_for_read</backlink></links><search><creatorcontrib>Nagarur, Nagen</creatorcontrib><creatorcontrib>Vrat, Prem</creatorcontrib><creatorcontrib>Duongsuwan, Wanchai</creatorcontrib><title>Production planning and scheduling for injection moulding of pipe fittings A case study</title><title>International journal of production economics</title><description>The present study considers the development of a production planning and scheduling model for injection moulding of PVC pipe fittings in a local factory. The objective is to minimize the total costs of production, inventory, and shortages. A three-stage sequential procedure is used to solve the problem. The total problem domain is divided into three subproblems by mould-machine grouping. Each subproblem is then solved as a single-machine, multi-product, capacity lot-sizing problem, with a three-month planning horizon. A linear, zero-one goal programming approach is used to generate the solution. Finally, the production plan of the first month is decomposed and scheduling for each individual machine is carried out by a heuristic procedure. Comparison of the results show that the new procedure can substantially reduce both shortage and inventory costs.</description><subject>Goal programming</subject><subject>Heuristic</subject><subject>Inventory control</subject><subject>Molding</subject><subject>Moulding</subject><subject>Operations research</subject><subject>Plastics industry</subject><subject>Production planning</subject><subject>Production scheduling</subject><subject>Scheduling</subject><subject>Studies</subject><issn>0925-5273</issn><issn>1873-7579</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1997</creationdate><recordtype>article</recordtype><sourceid>X2L</sourceid><recordid>eNqFkFFrFTEQhUNR6LX6E4TQJ31YzSQ3m-RJSmlrS0FBxceQTWbbXO7drMlu4f57s13pq4RJmOGcM-Ej5D2wT8Cg_fyDGS4byZX4YNRHxoCZpj0hG9BKNEoq84psXiSn5E0pO8aYAq035Pf3nMLsp5gGOu7dMMThgboh0OIfMcz7pe1TpnHY4ao6pHkflnHq6RhHpH2cptoXekG9K0jLNIfjW_K6d_uC7_69Z-TX9dXPy6_N_beb28uL-8ZvBZ8ahW0PAJ4HKbYAXTBb0AY0R-mcNoExobahdZp3CjtnusB5x2WH2lSPaMUZOV9zx5z-zFgmu0tzHupKC0bXw0BXkVxFPqdSMvZ2zPHg8tECswtC-4zQLnysUfYZoV3C71ZfxhH9iwkR6zb0yT5Z4aSo17EWmGoVLtbitcZlJJUFxezjdKhhX9YwrDieImZbfMTBY4i5orUhxf985y8YzpH1</recordid><startdate>19971120</startdate><enddate>19971120</enddate><creator>Nagarur, Nagen</creator><creator>Vrat, Prem</creator><creator>Duongsuwan, Wanchai</creator><general>Elsevier B.V</general><general>Elsevier</general><general>Elsevier Sequoia S.A</general><scope>DKI</scope><scope>X2L</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7TA</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JG9</scope><scope>KR7</scope></search><sort><creationdate>19971120</creationdate><title>Production planning and scheduling for injection moulding of pipe fittings A case study</title><author>Nagarur, Nagen ; Vrat, Prem ; Duongsuwan, Wanchai</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c432t-7e6f111c2d53411bd94189182e5aa89d00374d6a82b7eba9bd22b25be89c2d363</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1997</creationdate><topic>Goal programming</topic><topic>Heuristic</topic><topic>Inventory control</topic><topic>Molding</topic><topic>Moulding</topic><topic>Operations research</topic><topic>Plastics industry</topic><topic>Production planning</topic><topic>Production scheduling</topic><topic>Scheduling</topic><topic>Studies</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Nagarur, Nagen</creatorcontrib><creatorcontrib>Vrat, Prem</creatorcontrib><creatorcontrib>Duongsuwan, Wanchai</creatorcontrib><collection>RePEc IDEAS</collection><collection>RePEc</collection><collection>CrossRef</collection><collection>Materials Business File</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Materials Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>International journal of production economics</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Nagarur, Nagen</au><au>Vrat, Prem</au><au>Duongsuwan, Wanchai</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Production planning and scheduling for injection moulding of pipe fittings A case study</atitle><jtitle>International journal of production economics</jtitle><date>1997-11-20</date><risdate>1997</risdate><volume>53</volume><issue>2</issue><spage>157</spage><epage>170</epage><pages>157-170</pages><issn>0925-5273</issn><eissn>1873-7579</eissn><coden>IJPCEY</coden><abstract>The present study considers the development of a production planning and scheduling model for injection moulding of PVC pipe fittings in a local factory. The objective is to minimize the total costs of production, inventory, and shortages. A three-stage sequential procedure is used to solve the problem. The total problem domain is divided into three subproblems by mould-machine grouping. Each subproblem is then solved as a single-machine, multi-product, capacity lot-sizing problem, with a three-month planning horizon. A linear, zero-one goal programming approach is used to generate the solution. Finally, the production plan of the first month is decomposed and scheduling for each individual machine is carried out by a heuristic procedure. Comparison of the results show that the new procedure can substantially reduce both shortage and inventory costs.</abstract><cop>Amsterdam</cop><pub>Elsevier B.V</pub><doi>10.1016/S0925-5273(97)00109-6</doi><tpages>14</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0925-5273 |
ispartof | International journal of production economics, 1997-11, Vol.53 (2), p.157-170 |
issn | 0925-5273 1873-7579 |
language | eng |
recordid | cdi_proquest_journals_198989018 |
source | RePEc; Elsevier ScienceDirect Journals |
subjects | Goal programming Heuristic Inventory control Molding Moulding Operations research Plastics industry Production planning Production scheduling Scheduling Studies |
title | Production planning and scheduling for injection moulding of pipe fittings A case study |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T03%3A57%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Production%20planning%20and%20scheduling%20for%20injection%20moulding%20of%20pipe%20fittings%20A%20case%20study&rft.jtitle=International%20journal%20of%20production%20economics&rft.au=Nagarur,%20Nagen&rft.date=1997-11-20&rft.volume=53&rft.issue=2&rft.spage=157&rft.epage=170&rft.pages=157-170&rft.issn=0925-5273&rft.eissn=1873-7579&rft.coden=IJPCEY&rft_id=info:doi/10.1016/S0925-5273(97)00109-6&rft_dat=%3Cproquest_cross%3E25738611%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=198989018&rft_id=info:pmid/&rft_els_id=S0925527397001096&rfr_iscdi=true |