Production planning and scheduling for injection moulding of pipe fittings A case study

The present study considers the development of a production planning and scheduling model for injection moulding of PVC pipe fittings in a local factory. The objective is to minimize the total costs of production, inventory, and shortages. A three-stage sequential procedure is used to solve the prob...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production economics 1997-11, Vol.53 (2), p.157-170
Hauptverfasser: Nagarur, Nagen, Vrat, Prem, Duongsuwan, Wanchai
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The present study considers the development of a production planning and scheduling model for injection moulding of PVC pipe fittings in a local factory. The objective is to minimize the total costs of production, inventory, and shortages. A three-stage sequential procedure is used to solve the problem. The total problem domain is divided into three subproblems by mould-machine grouping. Each subproblem is then solved as a single-machine, multi-product, capacity lot-sizing problem, with a three-month planning horizon. A linear, zero-one goal programming approach is used to generate the solution. Finally, the production plan of the first month is decomposed and scheduling for each individual machine is carried out by a heuristic procedure. Comparison of the results show that the new procedure can substantially reduce both shortage and inventory costs.
ISSN:0925-5273
1873-7579
DOI:10.1016/S0925-5273(97)00109-6