Multiobjective single machine scheduling with nontraditional requirements
Many scheduling problems encountered in practice are must address requirements that are not found in the literature like maximizing the number of jobs that have a particular color. These nontraditional requirements are sometimes an objective as when the desirability of a schedule increases with the...
Gespeichert in:
Veröffentlicht in: | International journal of production economics 2007-04, Vol.106 (2), p.574-584 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Many scheduling problems encountered in practice are must address requirements that are not found in the literature like maximizing the number of jobs that have a particular color. These nontraditional requirements are sometimes an objective as when the desirability of a schedule increases with the number of jobs of the same color that are scheduled consecutively. Other times, the requirements take the form of constraints as in cases where it is forbidden to have more than two consecutive jobs with a particular color. To complicate the situation, most real scheduling problems are multiobjective. This research centers on bicriteria scheduling with nontraditional requirements using an experimental approach and a Random Keys Genetic Algorithm to find Pareto optimal solutions. We address both traditional and nontraditional requirements in a single machine job shop with 20–50 jobs. |
---|---|
ISSN: | 0925-5273 1873-7579 |
DOI: | 10.1016/j.ijpe.2006.06.018 |