Scheduling ordered open shops

We examine special cases of the open-shop problem to further define the boundary between “easy” and “hard” versions of the problem. A polynomial algorithm to minimize the sum of completion times in a preemptive open shop with ordered jobs is presented. A modification of this algorithm also minimizes...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & operations research 1987, Vol.14 (3), p.257-264
Hauptverfasser: Liu, C.Y., Bulfin, R.L.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We examine special cases of the open-shop problem to further define the boundary between “easy” and “hard” versions of the problem. A polynomial algorithm to minimize the sum of completion times in a preemptive open shop with ordered jobs is presented. A modification of this algorithm also minimizes tardiness in an agreeable open shop. We then show that minimizing makespan in an ordered three-machine open shop is NP-complete, which implies many other open-shop problems are also NP-complete. Finally, we show that slightly different assumptions can change a “hard” problem to an “easy” one. This is illustrated by the problem of minimizing makespan in a three-machine open shop with ordered machines, which is NP-complete. However, by further assuming the job with longest processing time on machine one is different from the job having the longest processing time on the second machine, a polynomial algorithm exists.
ISSN:0305-0548
1873-765X
0305-0548
DOI:10.1016/0305-0548(87)90029-3