A quick and effective method for capacitated lot sizing with startup and reservation costs

We present a pure zerp-one integer programming model for determining single-item production lot sizes in capacitated “long production run” environments, where each production period is dedicated to a single product, and where production of a given item may extend over more than one production period...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & operations research 1995-07, Vol.22 (6), p.641-653
Hauptverfasser: Coleman, B.Jay, McKnew, Mark A.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We present a pure zerp-one integer programming model for determining single-item production lot sizes in capacitated “long production run” environments, where each production period is dedicated to a single product, and where production of a given item may extend over more than one production period. All costs, as well as capacity, are time-varying, and include startup (changeover), reservation (opportunity), holding, and production costs. Holding and production cost may also vary within a period. The problem setting is effectively the single-item subproblem of the “multiple product cycling” case. Our a model is efficient primarily because of variable elimination strategies associated with capacity limitations. Although our formulation makes two simplifying assumptions versus previous research, these did not significantly hamper model performance. Experimentation on problems from the literature yielded a 93% optimality frequency, with less than 60 pivots required for 20 period problems, a tremendous efficiency improvement over previous models. As such, the model represents an excellent and practical first step toward efficiently solving multiple product problems on an industrial scale.
ISSN:0305-0548
1873-765X
0305-0548
DOI:10.1016/0305-0548(94)00039-B