A goal approach to assembly line balancing

A zero-one goal programming model for the assembly line balancing problem is developed. The goal model provides increased flexibility in constructing line balances by simultaneously considering varying operational requirements, such as zoning, sequencing, idle time, cycle time and costs. A sensitivi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & operations research 1990, Vol.17 (5), p.509-521
Hauptverfasser: Deckro, Richard F, Rangachari, Sarangan
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A zero-one goal programming model for the assembly line balancing problem is developed. The goal model provides increased flexibility in constructing line balances by simultaneously considering varying operational requirements, such as zoning, sequencing, idle time, cycle time and costs. A sensitivity analysis of an example model highlights the usefulness of the approach in the planning stages of a line balance development.
ISSN:0305-0548
1873-765X
0305-0548
DOI:10.1016/0305-0548(90)90055-C