An analysis of the 1996 Channel Tunnel fire

On 18 November 1996, a fire on Heavy Goods Vehicle shuttle No. ‘7539’, travelling from France to England, forced the train to stop at about 19 km from the French entrance. This paper presents the results of an analysis of the accident. The analysis covers the incident train’s journey from the French...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Proceedings of the Institution of Mechanical Engineers. Part F, Journal of rail and rapid transit Journal of rail and rapid transit, 2017-09, Vol.231 (8), p.850-876
Hauptverfasser: Santos-Reyes, Jaime, Beard, Alan N
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:On 18 November 1996, a fire on Heavy Goods Vehicle shuttle No. ‘7539’, travelling from France to England, forced the train to stop at about 19 km from the French entrance. This paper presents the results of an analysis of the accident. The analysis covers the incident train’s journey from the French terminal until it stopped in-tunnel only. The approach has been to use a tunnel fire safety management system model as a ‘template’ for comparison with the ‘system’ at the time of the tunnel fire. Some findings have been highlighted. The model is intended to represent a ‘systemic’ approach to tunnel fire safety management.
ISSN:0954-4097
2041-3017
DOI:10.1177/0954409716647093