Pilot size matters: the case of a full scale pilot for P-recovery from digestate in Belgium

In Leuven, Belgium, a full-scale pilot plant to test P-recovery from digested municipal wastewater sludge was built in April 2013. This paper illustrates the value of using large-size pilot-plant by explaining the economic evaluation of the installation. The uncertainty analysis of the price per ton...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Water practice and technology 2016-09, Vol.11 (3), p.517-523
Hauptverfasser: Geerts, Sam, Marchi, Adrien, Saerens, Bart, Weemaes, Marjoleine
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In Leuven, Belgium, a full-scale pilot plant to test P-recovery from digested municipal wastewater sludge was built in April 2013. This paper illustrates the value of using large-size pilot-plant by explaining the economic evaluation of the installation. The uncertainty analysis of the price per tonne of phosphorus (P) recovered on the basis of the information available during planning is compared with analyses after six months and then two years of operation. It is shown that the most sensitive of the economic model's parameters should determine the size of the pilot-plant.
ISSN:1751-231X
1751-231X
DOI:10.2166/wpt.2016.054