A coordination mechanism for a scheduling game with parallel-batching machines

In this paper we consider the scheduling problem with parallel-batching machines from a game theoretic perspective. There are m parallel-batching machines each of which can handle up to b jobs simultaneously as a batch. The processing time of a batch is the time required for processing the longest j...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of combinatorial optimization 2017-02, Vol.33 (2), p.567-579
Hauptverfasser: Nong, Q. Q., Fan, G. Q., Fang, Q. Z.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper we consider the scheduling problem with parallel-batching machines from a game theoretic perspective. There are m parallel-batching machines each of which can handle up to b jobs simultaneously as a batch. The processing time of a batch is the time required for processing the longest job in the batch, and all the jobs in a batch start and complete at the same time. There are n jobs. Each job is owned by a rational and selfish agent and its individual cost is the completion time of its job. The social cost is the largest completion time over all jobs, the makespan. We design a coordination mechanism for the scheduling game problem. We discuss the existence of pure Nash Equilibria and offer upper and lower bounds on the price of anarchy of the coordination mechanism. We show that the mechanism has a price of anarchy no more than 2 - 2 3 b - 1 3 max { m , b } .
ISSN:1382-6905
1573-2886
DOI:10.1007/s10878-015-9980-9