Simulation-Assisted Evaluation of Grinding Circuit Flowsheet Design Alternatives: Aghdarreh Gold Ore Processing Plant / Ocena Alternatywnych Schematów Technologicznych Procesu Rozdrabniania W Zakładach Przeróbki Rud Złota W Aghdarreh, Z Wykorzystaniem Metod Symulacji

The run of mine ore from Aghdarreh gold mine must be comminuted to achieve the desired degree of liberation of gold particles. Currently, comminution circuits include a single-stage crushing using a jaw crusher and a single-stage grinding using a Semi-Autogenous Grinding (SAG) mill in closed circuit...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Archives of mining sciences = Archiwum górnictwa 2015-03, Vol.60 (1), p.123-141
Hauptverfasser: Farzanegan, A., Ghalaei, A. Ebtedaei
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The run of mine ore from Aghdarreh gold mine must be comminuted to achieve the desired degree of liberation of gold particles. Currently, comminution circuits include a single-stage crushing using a jaw crusher and a single-stage grinding using a Semi-Autogenous Grinding (SAG) mill in closed circuit with a hydrocyclone package. The gold extraction is done by leaching process using cyanidation method through a series of stirred tanks. In this research, an optimization study of Aghdarreh plant grinding circuit performance was done to lower the product particle size (P ) from 70 μm to approximately 40 μm by maintaining current throughput using modeling and simulation approach. After two sampling campaigns from grinding circuit, particle size distribution data were balanced using NorBal software. The first and second data sets obtained from the two sampling campaigns were used to calibrate necessary models and validate them prior to performing simulation trials using MODSIM software. Computer simulations were performed to assess performance of two proposed new circuit flowsheets. The first proposed flowsheet consists of existing SAG mill circuit and a new proposed ball mill in closed circuit with a new second hydrocyclone package. The second proposed flowsheet consists of existing SAG mill circuit followed by a new proposed ball mill in closed circuit with the existing hydrocyclone package. In all simulations, SAGT, CYCL and MILL models were selected to simulate SAG mill, Hydrocyclone packages and ball mill units. SAGT and MILL models both are based on population balance model of grinding process. CYCL model is based on Plitt’s empirical model of classification process in hydrocyclone units. It was shown that P can be reduced to about 40 μm and 42 μm for the first and second proposed circuits, respectively. Based on capital and operational costs, it can be concluded that the second proposed circuit is a more suitable option for plant grinding flowsheet modification. Surowy urobek z kopalni rud złota Aghdarreh musi najpierw zostać poddany rozdrobnieniu, aby zapewnić efektywniejsze uwalnianie cząsteczek złota. W chwili obecnej obiegi rozdrabniania obejmują kruszenie jednostopniowe z wykorzystaniem kruszarek szczękowych oraz kruszenie jednostopniowe z użyciem kruszarek półautomatycznych w obiegu zamkniętym z hydrocyklonem. Odzysk złota odbywa się przy zastosowaniu procesu ługowania, z zastosowaniem metody cyjankowej w szeregu mieszalników. W pracy tej przeprowadz
ISSN:1689-0469
0860-7001
1689-0469
DOI:10.1515/amsc-2015-0009