In search of extendable conditions for cable environmental qualification in nuclear power plants

The environmental qualification (EQ) for cable insulators in nuclear power plants (NPPs) has been developed on the basis of the design basis accident (DBA) to prevent reactor core damage. However, the latest safety principles require extending the design concept to prepare the utilized equipment for...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of nuclear science and technology 2016-11, Vol.53 (11), p.1735-1741
Hauptverfasser: Alshaketheep, Tariq, Murakami, Kenta, Sekimura, Naoto, Itoi, Tatsuya
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The environmental qualification (EQ) for cable insulators in nuclear power plants (NPPs) has been developed on the basis of the design basis accident (DBA) to prevent reactor core damage. However, the latest safety principles require extending the design concept to prepare the utilized equipment for scenarios after core damage. Thus, we propose a modification to the EQ for cables connecting utilized equipment at design extension conditions. This paper surveys all electrical components for accident management in boiling water reactor-4 (BWR-4), and identifies their connecting cables' functional category as low-voltage power, instrumentation, and control cables. The EQ temperature profile of these cables during the incident phase was addressed for extension. This required postulating maximum temperature environments according to accident scenarios, knowledge of cable integrity degradation, and their current evaluation by the EQ. To evaluate whether these environments are suitable stressors, heat testing was conducted on flame-retardant ethylene propylene rubber (FR-EPR)-insulated cables. On the basis of those results, we suggest a maximum primary peak temperature of the EQ temperature profile of 250 °C. We also suggest increasing the primary peak period of the EQ temperature profile to 48 h without experiment, on the basis of inherent excessive margin for mechanical integrity during the ageing phase.
ISSN:0022-3131
1881-1248
DOI:10.1080/00223131.2016.1152922