Fresh Ready-Mixed Concrete Waste in Construction Projects: A Planning Approach
In the current study, how planning and truck-mixer basedwaste amounts per 1 m3 fresh ready-mixed concrete (RMC) canbe determined was presented. Toward this aim, the formationprocess of the fresh RMC waste in construction projects wasfirst introduced in a detailed manner, together with an in-depthlit...
Gespeichert in:
Veröffentlicht in: | Organization, technology & management in construction technology & management in construction, 2015-12, Vol.7 (2), p.1280-1288 |
---|---|
Hauptverfasser: | , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In the current study, how planning and truck-mixer basedwaste amounts per 1 m3 fresh ready-mixed concrete (RMC) canbe determined was presented. Toward this aim, the formationprocess of the fresh RMC waste in construction projects wasfirst introduced in a detailed manner, together with an in-depthliterature review in this specific domain of the constructionengineering and management. Then, the measurement procedureof the waste amount or coefficient of the fresh RMC wasrevealed and discussed as a practical and creative planningknowledge. Hence, a useful and realistic waste managementperspective about the cost and potential environmental savingsof the RMC waste was drawn. |
---|---|
ISSN: | 1847-5450 1847-6228 |
DOI: | 10.5592/otmcj.2015.2.2 |