Interior Point Methods Applied to the Predispatch Hydroelectric System with Simulated Modification in the Network Topology
IIn this work, the prima-dual interior point methods are used to minimize the DC predispatch generation and transmission costs and loss on hydroelectric power systems with previously scheduled transmission line maneuvering. A matrix structure study is also performed considering the changes that occu...
Gespeichert in:
Veröffentlicht in: | Revista IEEE América Latina 2015-01, Vol.13 (1), p.143-149 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng ; por |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | IIn this work, the prima-dual interior point methods are used to minimize the DC predispatch generation and transmission costs and loss on hydroelectric power systems with previously scheduled transmission line maneuvering. A matrix structure study is also performed considering the changes that occur in the system. A simulation of maneuvers is performed through the transmission lines bound reduction. The new alternative is compared with the explicit maneuvering version, applied to IEEE test and Brazilian systems. |
---|---|
ISSN: | 1548-0992 1548-0992 |