Process parameter prediction via markov models of sub-activities
This work aims to fill a lacunae in the project-oriented production systems literature providing a formal analytic description of the rework effects formulae and the determination of the extended design time due to a certain degree of overlapping in a pair of activities. It is made through the utili...
Gespeichert in:
Veröffentlicht in: | R.A.I.R.O. Recherche opérationnelle 2014-07, Vol.48 (3), p.303-324 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This work aims to fill a lacunae in the project-oriented production systems literature providing a formal analytic description of the rework effects formulae and the determination of the extended design time due to a certain degree of overlapping in a pair of activities. It is made through the utilization of concepts of workflow construction with hidden (semi) Markov models theory and establishing a way to disaggregate activities into sub-activities, in order to determine the activity parameters used by the project scheduling techniques. With the aim to make a correlation between the entropy of the state transitions and the probability of changes, the information theory is also used, and the concept of impact caused by the probability of changes is provided. Numerical examples are shown for the purpose to demonstrate the applicability of the concepts developed, and one example of overlapping of two activities is shown. The original contributions of this work are shown on the last section. |
---|---|
ISSN: | 0399-0559 1290-3868 |
DOI: | 10.1051/ro/2014009 |