Multi-objective meta-heuristics to solve three-stage assembly flow shop scheduling problem with machine availability constraints

In this paper, a three-stage assembly flow shop scheduling problem with machine availability constraints is taken into account. Two objectives of minimising total weighted completion times (flow time) and minimising sum of weighted tardiness and earliness are simultaneously considered. To describe t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production research 2015-02, Vol.53 (3), p.944-968
Hauptverfasser: Shoaardebili, Niloofar, Fattahi, Parviz
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, a three-stage assembly flow shop scheduling problem with machine availability constraints is taken into account. Two objectives of minimising total weighted completion times (flow time) and minimising sum of weighted tardiness and earliness are simultaneously considered. To describe this problem, a mathematical model is presented. The problem is generalisation of three-machine flow shop scheduling problem and two-stage assembly flow shop scheduling problem. Since these problems are known to be NP-hard, the considered problem is also strongly NP-hard. Therefore, two multi-objective meta-heuristics are presented to efficiently solve this problem in a reasonable amount of time. Comprehensive computational experiments are performed to illustrate the performance of the presented algorithms.
ISSN:0020-7543
1366-588X
DOI:10.1080/00207543.2014.948575