Note to “Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm”
In this note, we show that there are some errors in the 0–1 integer programming model in recent paper [Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm 17 ( 2006 ) 493–507]. We point out these errors and correct them.
Gespeichert in:
Veröffentlicht in: | Journal of intelligent manufacturing 2014-02, Vol.25 (1), p.209-211 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this note, we show that there are some errors in the 0–1 integer programming model in recent paper [Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm 17 (
2006
) 493–507]. We point out these errors and correct them. |
---|---|
ISSN: | 0956-5515 1572-8145 |
DOI: | 10.1007/s10845-012-0693-y |