Note to “Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm”

In this note, we show that there are some errors in the 0–1 integer programming model in recent paper [Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm 17 ( 2006 ) 493–507]. We point out these errors and correct them.

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of intelligent manufacturing 2014-02, Vol.25 (1), p.209-211
Hauptverfasser: Demir, Yunus, İşleyen, Selçuk Kürşat
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this note, we show that there are some errors in the 0–1 integer programming model in recent paper [Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm 17 ( 2006 ) 493–507]. We point out these errors and correct them.
ISSN:0956-5515
1572-8145
DOI:10.1007/s10845-012-0693-y