Logistical support scheduling under stochastic travel times given an emergency repair work schedule

•A stochastic model is developed for optimal scheduling of logistical support.•A time–space network flow technique is adopted to create the stochastic model.•A heuristic algorithm is developed to solve the stochastic model.•An evaluation method is developed to evaluate the performance of the models....

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & industrial engineering 2014-01, Vol.67, p.20-35
Hauptverfasser: Yan, Shangyao, Lin, Chih-Kang, Chen, Sheng-Yu
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:•A stochastic model is developed for optimal scheduling of logistical support.•A time–space network flow technique is adopted to create the stochastic model.•A heuristic algorithm is developed to solve the stochastic model.•An evaluation method is developed to evaluate the performance of the models. Stochastic factors during the operational stage could have a significant influence on the planning results of logistical support scheduling for emergency roadway repair work. An optimal plan might therefore lose its optimality when applied in real world operations where stochastic disturbances occur. In this study we employ network flow techniques to construct a logistical support scheduling model under stochastic travel times. The concept of time inconsistency is also proposed for precisely estimating the impact of stochastic disturbances arising from variations in vehicle trip travel times during the planning stage. The objective of the model is to minimize the total operating cost with an unanticipated penalty cost for logistical support under stochastic traveling times in short term operations, based on an emergency repair work schedule, subject to related operating constraints. This model is formulated as a mixed-integer multiple-commodity network flow problem and is characterized as NP-hard. To solve the problem efficiently, a heuristic algorithm, based on problem decomposition and variable fixing techniques, is proposed. A simulation-based evaluation method is also presented to evaluate the schedules obtained using the manual method, the deterministic model and the stochastic model in the operation stage. Computational tests are performed using data from Taiwan’s 1999 Chi-Chi earthquake. The preliminary test results demonstrate the potential usefulness of the proposed stochastic model and solution algorithm in actual practice.
ISSN:0360-8352
1879-0550
DOI:10.1016/j.cie.2013.10.007