An Experimental Research on Optimization of Trajectory Bucket for Spillway Tunnel Outlet at Sanliping Hydropower Project

Several optimized designs of trajectory bucket pattern for spillway tunnel outlet are compared in the experiment of Sanliping hydropower project integer physical model and the results show that energy dissipation of outflow nappe is sufficient after optimization and no scouring occur near the riverb...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied Mechanics and Materials 2011-09, Vol.90-93, p.2740-2745
Hauptverfasser: Wang, Dang Wei, Huang, He Qing, Liu, Xiao Fang
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Several optimized designs of trajectory bucket pattern for spillway tunnel outlet are compared in the experiment of Sanliping hydropower project integer physical model and the results show that energy dissipation of outflow nappe is sufficient after optimization and no scouring occur near the riverbank either at high water level or at low water level, which ensure the security of spillway structure. And these experimental results can provide a scientific foundation for the design of Sanliping project.
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.90-93.2740