Research on Support Distribution of the Handling Equipment for 500-Meter Long Rail

Three sets of handling equipment were developed during the renovation of 500-meter long rail production line in Shahe Welding Rail Base Station. The equipment is nonstandard which includes multiple support units to uplift the long rail during its translating process. In this paper the relationship b...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied Mechanics and Materials 2012-01, Vol.130-134, p.650-653
Hauptverfasser: Kang, Jing Xin, Zhang, Lian Kai
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!