Research on Support Distribution of the Handling Equipment for 500-Meter Long Rail
Three sets of handling equipment were developed during the renovation of 500-meter long rail production line in Shahe Welding Rail Base Station. The equipment is nonstandard which includes multiple support units to uplift the long rail during its translating process. In this paper the relationship b...
Gespeichert in:
Veröffentlicht in: | Applied Mechanics and Materials 2012-01, Vol.130-134, p.650-653 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Three sets of handling equipment were developed during the renovation of 500-meter long rail production line in Shahe Welding Rail Base Station. The equipment is nonstandard which includes multiple support units to uplift the long rail during its translating process. In this paper the relationship between the number of supports and the performance of the equipment will be discussed in detail. |
---|---|
ISSN: | 1660-9336 1662-7482 1662-7482 |
DOI: | 10.4028/www.scientific.net/AMM.130-134.650 |